Name:
Vedanta Limited
Sector Other::
Lead, Lead Oil & Gas, Iron ore, Aluminum, Copper, Gold & Silver
Main Customer:
Whole Seller
Owner Name:
Navin Agarwal
Area of Work:
The first hot metal tapping in March 2008, the aluminium smelting unit at Jharsuguda has come a long way
to establish itself as the worlds largest single-location smelter. With an installed capacity of 1.75mtpa, backed by two smelters 0.5mtpa and 1.25mtpa (SEZ) and two power plants with a combined capacity of 3615MW, it boasts a run-rate of over 1.3mtpa. BALCO operates through its plant at Korba in Chhattisgarh with a smelter capacity of 0.57mtpa and power generation capacity of 2010MW. The state-of-theart alumina refinery at Lanjigarh feeds the aluminium smelters at Jharsuguda and BALCO and forms a crucial link in the value chain. It is one of the worlds largest, one-site integrated alumina refining complexes with a current capacity of c.2mtpa that can be ramped up to 6mtpa
Mission.:
*Enhance stakeholder value through exploration, innovation, operational excellence, safety and sustainability.
*Be a globally lowest cost producer.
*Maintain market leadership and customer delight
Vision:
Be the worlds largest and most admired Zinc-Lead & Silver Company
Summary of Activities:
Zinc India
Record underground mined metal production at 936kt, up 29% y-o-y. Total mined metal production marginally down 1% y-o-y, post closure of open-cast operations.
Record lead metal production at 198kt, up 18% y-o-y.
Record refined silver production at 679 tonnes, up 22% y-o-y. Zinc International
Commercial production commenced at Gamsberg in March 2019. Oil & Gas
Average gross production of 189kboepd for FY2019, up 2% y-o-y.
11 development drilling rigs as on March 2019, 99 wells drilled and 33 wells hooked up during FY2019 in Rajasthan.
Production sharing contracts (PSC) of Rajasthan and Ravva block extended for 10 years, subject to conditions.
Revenue sharing contract signed for 41 OALP blocks. Aluminium
Record aluminium production at 1,959kt, up 17% y-o-y
Record alumina production from Lanjigarh refinery at 1,501kt, up 24% y-o-y.
Q4 FY2019 hot metal cost of production significantly lower at US$1,776 per tonne, lower by 12% q-o-q. Power
Record PAF of 88% at the 1,980MW TSPL plant in FY2019. Iron Ore
Goa operations remain suspended due to state-wide directive from the Honble Supreme Court; engagement continues with the Government for a resumption of mining operations.
Production of saleable ore at Karnataka at 4.1 million tonnes, up 89% y-o-y. Steel
Record annual steel production at 1.2 million tonnes for FY2019, up 17% y-o-y.
Achieved hot metal production run-rate of c.1.5mtpa in FY2019. Copper India
Due legal process being followed to achieve a sustainable restart of the operations.
Corporate Social Responsibility (CSR)
:
S.No. |
Year
|
Net Profit
|
CSR Budget
|
CSR Expenditure
|
Areas of Expenditure
|
Details
|
|
Product(s) :
S.No. |
Title |
Quantity |
Details |
|
1 |
Electrical power Natural gas |
Electrical power Natural gas | Electrical power Natural gas |
2 |
Zinc India (HZL) |
894kt Silver: 679 tonnes | Worlds largest integrated zinc-lead producer.
Worlds second largest zinc mine at Rampura Agucha, India.
9th largest silver producer in the world.
Developing the largest undeveloped zinc deposit in the world at Gamsberg.
Zinc India has R&R of 403 million tonnes with mine life of c.25 years.
Zinc International has R&R of more than 434 million tonnes, supporting mine life in excess of 30 years. |
3 |
OIL & GAS |
189kboepd | Largest private sector oil & gas producer in India.
Operating 25% of Indias crude oil production.
Executing one of the largest polymer EOR projects in the world.
Footprint over a total acreage of c.50,000 square kilometres.
Gross proved and probable reserves and resources of 1,195mmboe. |
4 |
Aluminium smelters |
1,959kt | Largest installed aluminium capacity in India:
2.3 million tonnes per annum (mtpa).
Strategically located large-scale assets with integrated power and an Alumina refinery.
37% market share among domestic primary aluminium producers. |
5 |
POWER |
c.14bn kWh | One of Indias largest power generators with 9GW diversified power portfolio.
TSPL is the largest thermal power producer in the state of Punjab.
3.3GW of commercial power generation capacity, with balance for captive usage.
Leading producers of wind power in India: 96% thermal power and 4% from renewable energy sources. |
6 |
IRON ORE & STEEL |
1.2mn tonnes | Iron Ore
Karnataka iron ore mine with R&R of 81 million tonnes, and life of 18 years.
Value added business: three blast furnaces (0.8mtpa), two coke oven batteries (0.5mtpa) and two power plants (60MW).
Steel
Acquired in June 2018 under IBC process for an integrated iron ore and steel business.
Design capacity of 2.5mtpa.
Largely long steel products. |
7 |
COPPER |
90kt | *One of the largest copper producers in India.
* NB: The copper plant at Tuticorin has not been
operational since March 2018.
|
R&D Plan(s)
:
S.No. |
Year |
Budget |
Need |
Plan |
Details |
|
1 |
2019 |
0 | Process/Know-How | Specific area in which R&D
carried out by the Company | NA |
2 |
2019 |
NA | Technology | Copper Business | i. Alternate Material for pig iron
ii. Recovering of copper sulphate from the electrolyte
iii. Minor metals recovery from concentrate |
3 |
2019 |
| Technology | Aluminium Business | LED Installation in CPP all over the plant. |
Report(s) :
S.No. |
Year |
Type |
Title |
Link |
Detail |
|
1 |
2019 |
Annual Report | Annual Report | Download | Annual Report |
2 |
2019 |
Annual Report | Annual Report | Download | Annual Report |
Document(s) :
S.No. |
Year |
Link |
Detail |
|
1 |
Annual Report | Download | Annual Report |
2 |
Annual Report | Download | Annual Report |
Address(es) :
S.No. |
Primary/ Alternate Email
|
Mobile/ Phone |
City/ State/ Country |
Detail |
|
1 |
tatapower@tatapower.com / tatapower@tatapower.com | 912266658282/ 912266658282 | Mumbai / Maharashtra / India | Bombay House,
24, Homi Mody Street,
Mumbai 400 001 |
2 |
comp.sect@vedanta.co.in / comp.sect@vedanta.co.in | 912266434500/ 912266434500 | Mumbai/ Maharashtra / India | 1st Floor, C wing, Unit 103, Corporate Avenue Atul Projects, Chakala, Andheri (East) Mumbai Mumbai City MH 400093, Maharashtra |