1 |
2019 |
₹162971000 | Technology | Development
of guidelines
for prevention
& mitigation of
explosion hazard
by risk assessment
and determination of
explosibility of Indian
coal incorporating
risk based mine
emergency
evacuation and
re-entry protocol. | Purchase order for CFD Software,
Critical Oxidation Temperature set
up and TGA-DSC is expected to be
placed within 2 weeks. On a query
by Shri Milan Sen, Senior Manager,
CMPDI, Ranchi, it was informed that
once Chemical Igniter is purchased,
the experimentation in 20 L explosion
chamber will be started. Purchase
order for the chemical igniter has
already placed during December 2018
and the procurement process may
take 5-6 months from next month
onwards. |
2 |
2019 |
| Technology | Requirement of air
in mine for Mass
Production Technology | Literature survey related to above
project has been completed. The
project has got delayed due to
delay in procurement of equipment
required for the project. Construction
of simulation lab is in process. Field
activities will be started only after
procurement of balance equipment |
3 |
2019 |
| Technology | Design of cost effective
process flowsheet
for improved washing
efficiency of Indian Coking
and Non-coking coals.
| Literature survey completed.mater
related to pilot plant to be built at
Sudamdih washery has not been
finalized and it needs to be relooked on the scope of work of
the project and a decision to be
taken in this regard. IIT-ISM was
requested to convene a separate
meeting immediately involving
all the implementing agencies to
have a concrete decision for way
forward |
4 |
2019 |
| Technology | Development of Virtual
Reality Mine Simulator
(VRMS) for improving
safety and productivity
in coal mines. | • Preliminary literature survey
completed.
• Civil work including acoustics is in
the completion stage.
•Equipment procurement is in
progress.
• Proposed VRMS, coal mine
safety and operation modules will
be developed for one opencast
project [i.e. Nigahi Project, NCL]
and one underground coal mine [site
changed from Moonidih Mine, BCCL
to Jhanjra UG mine, ECL] of CIL. All
the necessary data from the mine
environment including map data,
geo-technical data, visual data, etc.
will be collected and provided into the
system to create the prototype mine
environment in Virtual Reality mode.
After the completion of project, |
5 |
2019 |
| Technology | Demonstration of
Coal Dry Beneficiation
System using
Radiometric Technique | • In pursuance to the decision
of the 27th meeting of the
Apex committee held on
07.02.2018, validation operation
of the demonstration plant was
undertaken during 28th to 29th
August 2018 in presence of the
representatives from BCCL;
PMD, CIL; S&T Division, CMPDI;
CMP Division, CMPDI, Ranchi
and M/s Ardee Hi-tech PVT.
Ltd. for assessing the efficacy
of the Radiometric Technique
(ArdeeSort) in dry deshalingof
coal. |
6 |
2019 |
₹162971000 | Technology | Development
of guidelines
for prevention
& mitigation of
explosion hazard
by risk assessment
and determination of
explosibility of Indian
coal incorporating
risk based mine
emergency
evacuation and
re-entry protocol. | Purchase order for CFD Software,
Critical Oxidation Temperature set
up and TGA-DSC is expected to be
placed within 2 weeks. On a query
by Shri Milan Sen, Senior Manager,
CMPDI, Ranchi, it was informed that
once Chemical Igniter is purchased,
the experimentation in 20 L explosion
chamber will be started. Purchase
order for the chemical igniter has
already placed during December 2018
and the procurement process may
take 5-6 months from next month
onwards. |
7 |
2018 |
0 | Process/Know-How | NA | NA |
8 |
2018 |
0 | Process/Know-How | NA | NA |